Call Support +91-85588-96644
TCYonline

Login

Sign Up

Please enter a Username or Email ID
Please enter a password
Keep me logged in
Please enter your name
Please enter your mobile number
You can't leave Captcha Code empty
By submitting this form, you agree to the Terms & Privacy Policy.
OR

Sign Up via Facebook

Sign Up via Google

Sign Up via Twitter

Download Software
Tests given

Download TCY App

App Image

Quantitative Ability Preparation for Bank PO/Clerical

(1137 Posts)

This thread is dedicated to preparation for Quantitative Ability section of Bank PO/Clerical exams conducted by SBI and IBPS. You may share questions related to topics like Number system, simplification, clocks & calendars, Mixtures & alligations, Ratio/Proportion, Time & Work, Time & Distance, Profit & Loss, Interest, LCM/HCF, Algebra, Geometry, Statistics etc.

Question should not exceed 100 characters.Use add options for multiple choice questions and "Uploadimage/Add related data" for passage text papers.
Question should be at least 10 characters long.
+
Add Options | Community Guidelines
Cancel
Pardha Saradhi Penta
Shared from Average on Aug 30, 2019 9:23 AM

According to Arjun, the height of a clock tower is between 46 m and 54 m. According to Dev, the height of the same clock tower is between 46 m and 53 m. Tushar's view is that the height of that clock tower is less than 50 m. If all of them are correct in their estimation, then what is the average of different probable heights of the clock tower?

 
48 m
48.5 m
144 m
47 m
46 m
Please type your answer before submitting.

Height of clock may be 47/48 in first two cases also possible

Sayandip Sarkar
Shared from SBI Clerical (Prelims) Mock - 21 on Jun 21, 2019 1:21 PM

The radius and height of a right-circular cone are in the ratio of 5 : 7. If its volume is 4950 m3, then find its slant height.

 
26 m
20 m
25.81 m
20.88 m
None of these
Please type your answer before submitting.

Solution is wrong.slant height=square root(h^2 r^2)=square root(21^2 15^2)=square root(441 225)=sq root(666)=approx 26

Naveet Brar
Shared from Time and Work - II on Jun 19, 2019 7:02 PM

A and B can do a piece of work in 30 days, while B and C can do the same work in 24 days and C and A in 20 days. They all work for 10 days, then B and C leave. How many more days will A take to finish the work?

 
26 days
22 days
18 days
14 days
None of these
Please type your answer before submitting.

I think the answer for this ques is 22 days

Karmvir Alok
Shared from Averages - III on May 01, 2019 7:49 PM

In a party, the male to female ratio is 5 : 4. If a male contributes Rs. 20 and a female contributes Rs. 10, then what is the average contribution per person?

 
Rs. 14.01
Rs. 15.55
Rs. 16.14
Rs. 17.55
None of these
Please type your answer before submitting.

Hindi me error hai shayad

Shreya Kayal
Shared from IBPS Clerical (Mains) Mock - 9 on Jan 15, 2019 1:09 PM

The perimeter of a rectangle, whose length is 6 metre more than its breadth, is 84 metre. What is the area of the triangle whose base is equal to the diagonal of the rectangle and height is equal to the length of the rectangle?

 
390 sq. metre
360 sq. metre
380 sq. metre
400 sq. metre
410 sq. meter
Please type your answer before submitting.

Here the answer will be 360 sq.mt but my answer is considered wrong.